Generally, the construction season for curb work, drive approaches, and sidewalks are from April 15 to October 31. However, the season is based on weather and approval from the Engineer. During these periods, extra precautions must be taken, but work is still permitted. The inspector also reserves the right to extend the construction season if necessary. After determining the season, the work can begin. However, if the season is extended, it is important to contact the Engineer for guidance.
Install a Concrete Driveway Approach
The materials for a concrete driveway approach may be the same as those for paving. However, these materials must be poured to an established grade and must support the load of traffic. In addition, the approach must be installed at the same time as the concrete sidewalks.
This requires good construction practices for driveway approaches. Listed below are the materials and specifications for concrete driveway approaches OC Concrete Driveway and Patio. Once the materials are purchased, you will need to follow the instructions and specifications for installation.
A residential driveway on a curbed street must have a concrete driveway. The width should be at least 20 feet and no more than 28 feet. If the curb is too narrow, it can be shaved down and filled with epoxy grout. However, recycled concrete cannot be used as a sub-base. Read also Superior Asphalt Services.
Ensure the new driveway approach has the right dimensions before starting the installation process. This will make the process much simpler and quicker. It will also increase your curb appeal.